All roofing contractors are required to be licensed through the City of Cheyenne Building Safety Division, permits are required to be pulled for each address.Residents should ensure contractors, including for roofing and siding, are licensed by the City and that the contractor has pulled a permit for their property.
The Building Department has launched their online license & permit portal. Company Contractors can find their claim code below to activate their online account, scroll down to Licenses and Permits then click on Building Safety Division – Contractor Licensing then follow the directions listed. An online account will be required to apply for permits with the Building Department.
Published on September 20, 2023
CHEYENNE – On Tuesday, September 19th Cheyenne Fire Rescue (CFR) responded to a reported structure fire in the 5200 block of Harmon Ave. Crews were dispatched at 11:47 p.m. and arrived on scene at 11:51 p.m.
Once on scene, CFR crews encountered a trailer home heavily involved in smoke and flame. First arriving units acted quickly to knock down the fire and mitigate its spread while other resources arrived. Shortly thereafter, Laramie County Fire Authority (LCFA) arrived to assist. With both CFR and LCFA on scene, the fire was deemed under control by 12:18 a.m. on Wednesday morning. Investigation into the cause of the fire is currently underway by LCFA as the fire’s origin was deemed to be within their jurisdiction. Estimated damage caused by the fire is unknown at this time.
American Medical Response (AMR) personnel were also on scene alongside CFR and LCFA crews.
-30-
Coronavirus (COVID-19)